Tag: Long Beach

  • Veterans Hospital – Asbestos & Lead Abatement

    Veterans Hospital – Asbestos & Lead Abatement

    [vc_row][vc_column width=”1/3″][vc_single_image image=”35696″ img_size=”full” alignment=”center”][/vc_column][vc_column width=”2/3″][vc_empty_space][vc_column_text]TriSpan Projects: Veterans Hospital

    Location: Long Beach & San Diego, California

    Contract Amount: $5,000.00 – $3,000,000.00

    Scope of Work: Asbestos & Lead Abatement[/vc_column_text][/vc_column][/vc_row][vc_row][vc_column][vc_empty_space][vc_column_text]

    Veterans Hospital And Various Asbestos Abatement Projects

    Tri Span, Inc. has conducted multiple asbestos and lead paint abatement projects throughout the Veterans Administration facilities. Our work was contracted by the following entities: Veterans Administration, Clark Construction and Thomas Land Clearing.

    The projects were high profile and extremely sensitive: The Veterans patient’s needs were first and foremost. The abatement of asbestos and lead materials was conducted during off hours and weekends.

    All work was completed to accommodate client’s needs and schedules.[/vc_column_text][vc_empty_space][/vc_column][/vc_row]

  • Long Beach Naval Shipyard – Asbestos Abatement

    Long Beach Naval Shipyard – Asbestos Abatement

    [vc_row][vc_column width=”1/3″][vc_single_image image=”3143″ img_size=”full” alignment=”center”][/vc_column][vc_column width=”2/3″][vc_empty_space][vc_column_text]TriSPan Projects: Long Beach Naval Shipyard

    Location: Long Beach, California

    Contract Amount: $4,500,000.00

    Scope of Work: Asbestos Abatement[/vc_column_text][/vc_column][/vc_row][vc_row][vc_column][vc_empty_space][vc_column_text]

    Long Beach Naval Shipyard and Other Various Projects

    Tri Span, Inc. was contracted by the following entities: Port of Long Beach and Viking / J&G Industries Demolition. The project entailed the abatement of asbestos, contaminated soil / debris and demolition of numerous structures over a three year period. This made way for an international container terminal.

    The project was high profile and extremely sensitive. All work was complete within specified time frames.[/vc_column_text][vc_empty_space][/vc_column][/vc_row]